Software Application

Software Application

In Software Application, we were taught how to use two programs, CostX and BuildSoft. This subject is one of the most interesting ones as we are generation Y and anything involving technology is to our advantage.

In CostX, we learn how to calculate the quantity of the materials involved in a project, much like how we do so in Measurement but it was much simpler and more accurate. It took less time than manual measurement and was quite easy to get a hang of.

In BuildSoft, we learn how to create a Bill of Quantities together with the price list. Here, we apply knowledge we learnt from Estimating to make a complete BQ.


Professional Practice 1

Professional Practice 1

PP1 is another subject that will be very important to us as it involves much of the work that we will be doing as a Quantity Surveyor. In PP1, we learn the contractual nature of the works, which is actually quite similar to law in semester 1. We learn how to interpret  the clauses involved in a contract, how it chosen and most importantly, how it is written.

A good contract and a bad contract will make a difference between the success of a project or utter failure. Loopholes will be taken advantage and the project will fail or go into delay if either party loses out. If its the client, then the project will fail, if its the contractor, then they may go into bankruptcy and be forced to bail out.


Structure

Structure

So far in the course, Structure has been my favourite subject as it involved the understanding of how force works and the calculation of it. Although we may not be using this knowledge often in the future, it is a very good additional knowledge. 

Estimating

Estimating

Estimating has been a very interesting subject to study. This subject actually teaches one of the main things that we as future Quantity Surveyors will have to carry out, which is pricing of the material.

We learn of the various factors that come into the cost of a certain element, such as the labour cost, and profit. We learn how to incorporate the rates and compile them into a final cost of the element.

We do need to do quite a few calculations for Estimating, but the most important thing I learnt was from our assignment. Where we were given an unpriced Bill of Quantities and are tasked to price them. This assignment involved many calls and contacting various suppliers to obtain the price rates that we require, which is a new experience to us. 

Construction Technology 3

Construction Technology 3

In CT3, we studied about mostly about the Industrial Building System(IBS). As the current forerunner of building technology, it is always interesting to learn more about this system, since we are most probably going to deal with it very often in the near future. 

It is always eye opening to see how creative people can be when trying to find the cheapest, fastest and most efficient way of doing things, in this case, construction of buildings. This subject has always given me a better grasp on the fact that there are always more solutions than questions. We just have to find the one that fits best.

Measurement 4

Measurement 4

For this subject, we started out with measurement of surface water drainage, and continued through most of the external works. It was very different from previous measurements because this time, there were quite a few things to think about instead of simple measurement, since we are given mostly typical drawings that only represent some aspects of the work instead of the actual drawing. So we must read through properly and make the proper assumptions to the actual works.

Other than that, our lecturer introduced a new type of test, which was focused on the importance of SMM. In this case, he taught us how to properly scrutinise the clauses by showing us wrong descriptions and having us fix them. It is a very different experience but the change of pace is definitely interesting as we have not done this before.